DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

High-voltage switchgear and controlgear - Part 103: Alternating current switches for rated voltages above 1 kV up to and including 52 kV

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

High-voltage switchgear and controlgear - Part 214: Internal arc classification for AC metal-enclosed pole-mounted switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

High-voltage switchgear and controlgear - Part 314: Direct current disconnectors and earthing switches

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

High-voltage switchgear and controlgear - Part 316: Direct current by-pass switches and paralleling switches

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

High-voltage switchgear and controlgear - Part 318: DC gas-insulated metal-enclosed switchgear for rated voltages including and above 100 kV

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

High-voltage switchgear and controlgear - Part 320: Environmental aspects and life cycle assessment rules for high-voltage switchgear and controlgear

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

High-voltage switchgear and controlgear - Part 5: Common specifications for direct current switchgear and controlgear

40.20 DIS ballot initiated: 12 weeks

DPS/KT 4 more

Single crystal wafers for surface acoustic wave (SAW) device applications - Specifications and measuring methods

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 1: Generic RAMS process

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Railway applications - Specification and demonstration of reliability, availability, maintainability and safety (RAMS) - Part 2: Systems approach to safety

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more

Fuel cell technologies - Part 3-200: Stationary fuel cell power systems - Performance test methods

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Fuel cell technologies - Part 3-201: Stationary fuel cell power systems - Performance test methods for small fuel cell power systems

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Fuel cell technologies - Part 3-202: Stationary fuel cell power systems - Performance test methods for small fuel cell power systems for multiple units operation

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Fuel cell technologies - Part 6-401: Micro fuel cell power systems - Power and data interchangeability - Performance test methods for laptop computer

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Fuel cell technologies - Part 7-3: Test methods - Status of accelerated tests for fuel cell stacks and components and perspectives for standardization

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Fuel cell technologies - Part 7-1: Test methods - Single cell performance tests for polymer electrolyte fuel cells (PEFC)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Fuel cell technologies - Part 7-2: Test methods - Single cell and stack performance tests for solid oxide fuel cells (SOFCs)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 6 more

Railway applications - Urban guided transport management and command/control systems - Part 1: System principles and fundamental concepts

40.20 DIS ballot initiated: 12 weeks

DPS/KT 7 more