Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Aerospace series - Plug, protective, non-metallic, for EN 6123 fitting ends
40.20 DIS ballot initiated: 12 weeks
Gas analysis - Comparison methods for determining and checking the composition of calibration gas mixtures (ISO 6143:2025)
40.20 DIS ballot initiated: 12 weeks
Low-voltage switchgear and controlgear assemblies - Part 5: Assemblies for power distribution in public networks
40.20 DIS ballot initiated: 12 weeks
Safety of machinery - Electro-sensitive protective equipment - Part 3: Particular requirements for active opto-electronic protective devices responsive to diffuse reflection (AOPDDR)
40.20 DIS ballot initiated: 12 weeks
Safety of machinery - Electro-sensitive protective equipment - Part 3: Particular requirements for active opto-electronic protective devices responsive to diffuse reflection (AOPDDR)
40.20 DIS ballot initiated: 12 weeks
Safety of machinery - Electro-sensitive protective equipment - Part 4-2: Particular requirements for equipment using vision based protective devices (VBPD) - Additional requirements when using reference pattern techniques (VBPDPP)
40.20 DIS ballot initiated: 12 weeks
Safety of machinery - Electro-sensitive protective equipment - Part 4-3: Particular requirements for equipment using vision based protective devices (VBPD) - Additional requirements when using stereo vision techniques (VBPDST)
40.20 DIS ballot initiated: 12 weeks
Portable residual current devices (PRCDs) without integral overcurrent protection for household and similar use
40.20 DIS ballot initiated: 12 weeks
Portable residual current devices (PRCDs) without integral overcurrent protection for household and similar use
40.20 DIS ballot initiated: 12 weeks
Panel mounted equipment - Electrical measuring instruments - Dimensions for panel mounting
40.20 DIS ballot initiated: 12 weeks
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 9: Equipment for insulation fault location in IT systems
40.20 DIS ballot initiated: 12 weeks
Safety of transformers, reactors, power supply units and combinations thereof - Part 2-5: Particular requirements and test for transformer for shavers, power supply units for shavers and shaver supply units
40.20 DIS ballot initiated: 12 weeks
Low-voltage surge protective devices - Part 01: General Requirements and test methods
40.20 DIS ballot initiated: 12 weeks
Low-voltage surge protective devices - Part 01: General Requirements and test methods
40.20 DIS ballot initiated: 12 weeks
Low-voltage surge protective devices - Part 11: Surge protective devices connected to AC low-voltage power systems - Requirements and test methods
40.20 DIS ballot initiated: 12 weeks
Low-voltage surge protective devices - Part 11: Surge protective devices connected to AC low-voltage power systems - Requirements and test methods
40.20 DIS ballot initiated: 12 weeks
Low-voltage surge protective devices - Part 41: Surge protective devices connected to DC low-voltage power systems - Requirements and test methods
40.20 DIS ballot initiated: 12 weeks
Low-voltage surge protective devices - Part 41: Surge protective devices connected to DC low-voltage power systems - Requirements and test methods
40.20 DIS ballot initiated: 12 weeks