Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Terrestrial Trunked Radio (TETRA); Voice plus Data (V + D); Part 3: Interworking at the Inter-System Interface (ISI); Sub-part 1: General design
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 4: Gateways basic operation; Sub-part 1: Public Switched Telephone Network (PSTN)
40.20 DIS ballot initiated: 12 weeks
Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Voice plus Data (V+D); Part 7: Security
40.20 DIS ballot initiated: 12 weeks
Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 1: General network design
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 10: SDL model of the Air Interface (AI)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 11: Protocol Implementation Conformance Statement (PICS) proforma specification
40.20 DIS ballot initiated: 12 weeks
Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 2: Air Interface (AI)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 2: Air Interface (AI)
40.20 DIS ballot initiated: 12 weeks
Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 7: Security
40.20 DIS ballot initiated: 12 weeks
Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Conformance testing specification; Part 1: Radio
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 1: Test suite structure and test purposes
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 2: Abstract Test Suite (ATS) for Network (NWK) layer
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 3: Abstract Test Suite (ATS) for Logical Link Control (LLC)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 4: Abstract Test Suite (ATS) for Medium Access Control (MAC)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 10: Abstract Test Suite (ATS) for Direct Mode Gateway (DM-GATE)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 2: Abstract Test Suite (ATS) for Mobile Station to Mobile Station (MS-MS) Air Interface (AI)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 7: Test Suite Structure and Test Purposes (TSS&TP) for Mobile Station to GateWay (MS-GW) Air Interface (AI)
40.20 DIS ballot initiated: 12 weeks
Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 8: Test Suite Structure and Test Purposes (TSS&TP) for Direct Mode Gateway (DM-GATE)
40.20 DIS ballot initiated: 12 weeks