DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Packet Data Optimized (PDO); Part 7: Security

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Conformance testing specification; Part 1: Radio

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 1: Test suite structure and test purposes

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 2: Abstract Test Suite (ATS) for Network (NWK) layer

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 3: Abstract Test Suite (ATS) for Logical Link Control (LLC)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 2: Protocol testing specification for Voice plus Data (V+D); Sub-part 4: Abstract Test Suite (ATS) for Medium Access Control (MAC)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 10: Abstract Test Suite (ATS) for Direct Mode Gateway (DM-GATE)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 2: Abstract Test Suite (ATS) for Mobile Station to Mobile Station (MS-MS) Air Interface (AI)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 7: Test Suite Structure and Test Purposes (TSS&TP) for Mobile Station to GateWay (MS-GW) Air Interface (AI)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 8: Test Suite Structure and Test Purposes (TSS&TP) for Direct Mode Gateway (DM-GATE)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 9: Abstract Test Suite (ATS) for Mobile Station (MS) Gateway

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 5: Security; Sub-part 3: Abstract Test Suite (ATS)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Radio Equipment and Systems (RES); Trans-European Trunked Radio (TETRA); Speech codec for full-rate traffic channel; Part 4: Codec conformance testing

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Terrestrial Trunked Radio (TETRA); Technical requirements for Direct Mode Operation (DMO); Part 8: Protocol Implementation Conformance Statement (PICS) proforma specification; Sub-part 3: Gateway Air Interface (AI)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Frame relay services; Part 1: General description

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Frame relay services; Part 2: Integrated Services Digital Network (ISDN); Frame relay bearer service; Service definition

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Frame relay services; Part 3: Frame relay data transmission service; Service definition

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more

Frame relay services; Part 4: Broadband Integrated Services Digital Network (B-ISDN); Frame relay bearer service; Service definition

40.20 DIS ballot initiated: 12 weeks

DPS/KT 10 more