DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

ISO/FDIS 14306-4

Industrial automation systems and integration — JT file format specification for 3D visualization — Part 4: Version 3

General information

50.20     Nov 24, 2025

ISO

ISO/TC 184/SC 4

International Standard

35.240.50  

Scope

The JT file format specification for 3D visualization specifies the sequential order of bytes that comprise the segments of data required to represent a JT file. The JT format is uniquely compressed to minimize file size.
The JT file format specification for 3D visualization includes data descriptions that can represent the following data.
— facet information (triangles), stored with geometry compression techniques;
— visual attributes such as lights, textures and materials;
— product manufacturing information (PMI);
— boundary representation (b-rep) solid model shape representation and associated metadata;
— configuration representations; and
— delivery methods such as asynchronous streaming of content.

The following geometry representation are proposed to be deprecated in the ISO 14306 Part 4 specification
— lightweight ULP geometric boundary representation;
— lightweight LWPA precise analytic geometric boundary representation;

A complete list of Product Manufacturing Information (PMI) String Property Atom Element values will be made available as a Reference Data Library in electronic insert format. A number of Material and Surface attributes referenced by the ISO 14306-4 specification will also be defined in a separate Reference Data Library in electronic insert format.

The JT file format specification for 3D visualization does not specify the implementation of, or definition of, any runtime architecture for viewing and/or processing JT data.

Life cycle

PREVIOUSLY

PUBLISHED
ISO 14306:2017

NOW

IN_DEVELOPMENT
ISO/FDIS 14306-4
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Nov 24, 2025

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login