DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

ISO/TS 13725:2021

Hydraulic fluid power — Method for evaluating the buckling load of a hydraulic cylinder

Sep 16, 2021

General information

90.60     Sep 3, 2024

ISO

ISO/TC 131/SC 3

Technical Specification

23.100.20  

English   French  

Buying

Published

Language in which you want to receive the document.

Scope

This document specifies a method for the evaluation of the buckling load which:
a) takes into account a geometric model of the hydraulic cylinder, meaning it does not treat the hydraulic cylinder as an equivalent column,
b) can be used for all types of cylinder mounting and rod end connection specified in Table 2,
c) includes a factor of safety, k, to be set by the person performing the calculations and reported with the results of the calculations,
d) takes into account possible off-axis loading,
e) takes into account the weight of the hydraulic cylinder, meaning it does not neglect all transverse loads applied on the hydraulic cylinder,
f) can be implemented as a simple computer program, and
g) considers the cylinder fully extended.
The method specified is based on the elastic buckling theory and is applicable to single and double acting cylinders that conform to ISO 6020 (all parts), ISO 6022 and ISO 10762. If necessary, finite element analyses can be used to verify as well as to determine the buckling load.
The method is not developed for thin-walled cylinders, double-rods or plunger cylinders.
The method is not developed for internal (rod) buckling.
The friction of spherical bearings is not taken into account.
NOTE       This method is based mainly on original work by Fred Hoblit[2]. This method has been established in reference to the standard NFPA/T3.6.37[1].

Life cycle

PREVIOUSLY

Revises
ISO/TS 13725:2016

NOW

PUBLISHED
ISO/TS 13725:2021
90.60 Close of review
Sep 3, 2024

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login