DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

ISO 1920-14:2019

Testing of concrete — Part 14: Setting time of concrete mixtures by resistance to penetration

Nov 13, 2019

General information

90.60     Mar 5, 2025

ISO

ISO/TC 71/SC 1

International Standard

91.100.30  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This document covers the method for determining the setting time of concrete with slump greater than zero, by testing mortar sieved from the concrete mixture. The initial setting time and the final setting time are the time intervals required for the mortar sieved from the concrete mixture to reach the specified values of penetration resistance after the initial contact of cement and water.
The method can be used for determining the effect of variables such as temperature, type and content of cement, concrete mix proportions and admixtures, on the time of setting and hardening characteristics of concrete.
This test method is applicable under controlled laboratory conditions, as well as under field conditions.

Life cycle

NOW

PUBLISHED
ISO 1920-14:2019
90.60 Close of review
Mar 5, 2025

National adoptions

Testing of concrete — Part 14: Setting time of concrete mixtures by resistance to penetration

60.60 Standard published

DPS/KT 104 more