DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

ISO/TR 21245-2:2016

Railway applications — Rail project planning process — Part 2: Conditions

Oct 31, 2016
95.99 Withdrawal of Standard   Dec 3, 2018

General information

95.99     Dec 3, 2018

ISO

ISO/TC 269

Technical Report

45.020  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

ISO/TR 21245-2:2016 aims to identify basic conditions of rail projects, which are essential input for the design of rail systems. This document does not interfere with existing national and local laws, legal requirements and regulations. It considers only the "planning stage" of rail projects and does not deal with the "execution stage". Any type of rail projects is intended to be dealt with, such as building a new line, retrofitting or upgrading of existing lines and change of operation or maintenance.
In ISO/TR 21245-2:2016, conditions are dealt with as premises or constraints, which can be difficult to adjust or change by stakeholders concerned in the project.

Life cycle

NOW

WITHDRAWN
ISO/TR 21245-2:2016
95.99 Withdrawal of Standard
Dec 3, 2018

REVISED BY

PUBLISHED
ISO/TR 21245:2018

National adoptions

Railway applications — Rail project planning process — Part 2: Conditions

60.60 Standard published

DPS/KT 256 more