DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

ISO/TS 10303-1622:2006

Industrial automation systems and integration — Product data representation and exchange — Part 1622: Application module: AP210 interconnect technology constraints

Dec 13, 2006

General information

90.93     Feb 25, 2020

ISO

ISO/TC 184/SC 4

Technical Specification

25.040.40  

English  

Buying

Published

Language in which you want to receive the document.

Scope

ISO/TS 10303-1622:2006 specifies the application module for AP210 interconnect technology constraints.
ISO/TS 10303-1622:2006 deals with the representation of interconnect technology constraints. This data includes all information provided to the design team by fabrication suppliers from which may be derived default land and passage definitions, based on the desired yield for fabrication and assembly processes. Typical data includes
minimum annular ring,maximum passage aspect ratio,minimum deposition thickness,maximum terminal size supported for through hole technology class, andother critical material processing properties.
Configuration management information and design change management information is provided. This data includes at least one geometric representation. ISO/TS 10303-1622:2006 also supports description of simple and complex templates for layout design, and definition of technology specific layer stackup models able to support multiple material combinations.
The following are within the scope of ISO/TS 10303-1622:2006:
fabrication technology properties; layout pattern templates; layout pattern template properties; definition of stratum stack model; manufacturing technology specification; generic layered manufacturing technology properties.

Life cycle

NOW

PUBLISHED
ISO/TS 10303-1622:2006
90.93 Standard confirmed
Feb 25, 2020

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login