DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC TR 61459:1996 ED1

Coordination between fuses and contactors/motor-starters - Application guide

Aug 13, 1996

General information

99.60     Sep 23, 2010

IEC

TC 32/SC 32B

Technical Report

29.120.20     29.120.50  

English   French  

Buying

Replaced

Language in which you want to receive the document.

Scope

Provides guidance to assist in selecting a fuse-link to ensure coordination with contactors or motor-starters (contactors with overload relay).

The coordination between motor-starters and the fuses which protect
them is covered in IEC standards by test requirements such as those
in IEC 60947, in particular parts 1 and 4.

Overcurrent protection of other equipment, such as motors,
conductors, etc., is not covered by this publication.

The contents of the corrigendum of February 2001 have been included in this copy.

Life cycle

NOW


IEC TR 61459:1996 ED1
99.60 Withdrawal effective
Sep 23, 2010

CORRIGENDA / AMENDMENTS

Corrected by
IEC TR 61459:1996/COR1:2001 ED1

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login