DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania

IEC TS 60859:1999 ED2

Cable connections for gas-insulated metal-enclosed switchgear for rated voltages of 72,5 kV and above - Fluid-filled and extruded insulation cables - Fluid-filled and dry type cable-terminations

Jul 29, 1999

General information

99.60     Aug 9, 2007

IEC

TC 17/SC 17C

Technical Specification

29.120.20     29.130.10  

English   French  

Buying

Replaced

Language in which you want to receive the document.

Scope

Covers the connection assembly of cables to gas-insulated metal-enclosed switchgear in single- or three-phase arrangements where the cable terminations are fluid-filled and there is a separating insulating barrier between the cable insulation and the gas insulation of the switchgear.

The contents of corrigenda of February 2000 and December 2000 have been included in this copy.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC TS 60859 ED1

NOW

WITHDRAWN
IEC TS 60859:1999 ED2
99.60 Withdrawal effective
Aug 9, 2007

CORRIGENDA / AMENDMENTS

WITHDRAWN
IEC TS 60859/COR1/FRAGC1 ED2

WITHDRAWN
IEC TS 60859/COR2/FRAGC2 ED2

REVISED BY

WITHDRAWN
IEC 62271-209:2007 ED1