DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 61084-2-1:2017 ED2

Cable trunking systems and cable ducting systems for electrical installations - Part 2-1: Particular requirements - Cable trunking systems and cable ducting systems intended for mounting on walls and ceilings

Mar 22, 2017

General information

60.60     Mar 22, 2017

IEC

TC 23/SC 23A

International Standard

29.060.01     29.120.10  

English   French  

Buying

Published

Language in which you want to receive the document.

Scope

IEC 61084-2-1:2017 specifies requirements and tests for cable trunking systems (CTS) and cable ducting systems (CDS) intended for the accommodation, and where necessary for the electrically protective separation, of insulated conductors, cables and possibly other electrical equipment in electrical and/or communication systems installations. The maximum voltage of these installations is 1 000 V AC and 1 500 V DC.
These systems are intended for mounting on walls and/or ceilings. They can be embedded, installed in a flush or semi-flush state, surface mounted or mounted away from the surface using fixing devices.
This document does not apply to conduit systems, cable tray systems, cable ladder systems, power track systems or equipment covered by other standards.
This second edition cancels and replaces the first edition published in 1996. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
- classification;
- construction;
- mechanical and electrical properties.
This International Standard is to be used in conjunction with IEC 61084-1:2017.

Life cycle

PREVIOUSLY

Revises
IEC 61084-2-1:1996 ED1

Revises
IEC 61084-2-1/AMD1 ED1

NOW

PUBLISHED
IEC 61084-2-1:2017 ED2
60.60 Standard published
Mar 22, 2017

REVISED BY

IN_DEVELOPMENT
IEC 61084-2-1/AMD1 ED2

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login