DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC TR 61850-90-4:2013 ED1

Communication networks and systems for power utility automation - Part 90-4: Network engineering guidelines

Aug 6, 2013

General information

99.60     May 25, 2020

IEC

TC 57

Technical Report

33.200  

English  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC/TR 61850-90-4:2013(E) is intended for an audience familiar with network communication and/or IEC 61850-based systems and particularly for substation protection and control equipment vendors, network equipment vendors and system integrators. This Technical Report focuses on engineering a local area network limited to the requirements of IEC 61850-based substation automation. It outlines the advantages and disadvantages of different approaches to network topology, redundancy, clock synchronization, etc. so that the network designer can make educated decisions. In addition, this report outlines possible improvements to both substation automation and networking equipment. This Technical Report addresses the most critical aspects of IEC 61850, such as protection related to tripping over the network. This Technical Report addresses in particular the multicast data transfer of large volumes of sampled values from merging units. It also considers the high precision clock synchronization and "seamless" guaranteed transport of data across the network under failure conditions that is central to the process bus concept.

Life cycle

NOW

WITHDRAWN
IEC TR 61850-90-4:2013 ED1
99.60 Withdrawal effective
May 25, 2020

REVISED BY

PUBLISHED
IEC TR 61850-90-4:2020 ED2