DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 61158-4-2:2010 ED2

Industrial communication networks - Fieldbus specifications - Part 4-2: Application layer protocol specification - Type 2 elements

Aug 6, 2010

General information

99.60     Aug 14, 2014

IEC

TC 65/SC 65C

International Standard

25.040.40     35.100.20     35.110  

English   French  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 61158-4-2:2010 provides communication opportunities to all participating data-link entities, sequentially and in a cyclic synchronous manner. Foreground scheduled access is available for time-critical activities together with background unscheduled access for less critical activities. It provides means to maintain clock synchronization across an extended link with a precision better than 10 ms. This protocol optimizes each access opportunity by concatenating multiple DLSDUs and associated DLPCI into a single DLPDU, thereby improving data transfer efficiency for data-link entities that actively source multiple streams of data. This second edition cancels and replaces the first edition published in 2007 and constitutes a technical revision. The main changes with respect to the previous edition are:
- update of normative and bibliographic references;
- update of abbreviations;
- updates of the Ethernet Link object;
- new DLR and QoS objects;
- new DLR protocol. This bilingual version (2012-07) corresponds to the monolingual English version, published in 2010-08.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61158-4-2:2007 ED1

NOW

WITHDRAWN
IEC 61158-4-2:2010 ED2
99.60 Withdrawal effective
Aug 14, 2014

REVISED BY

WITHDRAWN
IEC 61158-4-2:2014 ED3