DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 61326-3-1:2008 ED1

Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 3-1: Immunity requirements for safety-related systems and for equipment intended to perform safety-related functions (functional safety) - General industrial applications

Jan 30, 2008

General information

99.60     May 16, 2017

WPUB   

IEC

TC 65/SC 65A

International Standard

25.040.40     33.100.20  

English   French   Spanish  

Buying

Revised

Language in which you want to receive the document.

Scope

IEC 61326-1 applies to this part of IEC 61326 but is limited to systems and equipment for industrial applications intended to perform safety functions as defined in IEC 61508 with SIL 1-3. The electromagnetic environments encompassed by this product family standard are industrial, both indoor and outdoor, as described for industrial locations in IEC 61000-6-2 or defined in 3.7 of IEC 61326-1. Equipment and systems intended for use in other electromagnetic environments, for example, in the process industry or in environments with potentially explosive atmospheres, are excluded from the scope of this product family standard, IEC 61326-3-1. The contents of the corrigendum of September 2008 have been included in this copy.

Life cycle

PREVIOUSLY

WITHDRAWN
IEC 61326:2002 ED1

WITHDRAWN
IEC 61326:2002/COR1:2002 ED1

NOW

WITHDRAWN
IEC 61326-3-1:2008 ED1
99.60 Withdrawal effective
May 16, 2017

CORRIGENDA / AMENDMENTS

WITHDRAWN
IEC 61326-3-1:2008/COR1:2008 ED1

REVISED BY

PUBLISHED
IEC 61326-3-1:2017 ED2