DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 62391-2 ED2

Fixed electric double-layer capacitors for use in electronic equipment - Part 2: Sectional specification - Electric double-layer capacitors for power application

General information

50.20     Nov 22, 2024

PRVD    Jan 3, 2025

IEC

TC 40

International Standard

31.060.10  

Scope

IEC 62391-2 ED2 applies to electric double-layer capacitors for power application.
Electric double-layer capacitors for power are intended for applications that require discharge currents in the range from mA to A. The characteristics of the capacitors include such performance as relatively high capacitance and low internal resistance, which is applicable to Class 3 and Class 5 of the measurement classification specified in IEC 62391-1:2022.
The object of this document is to specify preferred ratings and characteristics and to select from IEC 62391-1:2022 the appropriate quality assessment procedures, tests and measuring methods and to give general performance requirements for this type of capacitor. Test severities and requirements specified in detail specifications referring to this document provide specific test severities and requirements of an equal or higher performance level.
The definition of power density and its calculating procedure can be found in Annex A.
This edition includes the following significant technical changes with respect to the previous edition:
a) the document has been completely restructured to comply with the ISO/IEC Directives, Part 2;
b) introduction of a new technical categorization for the test methods;
c) reorganization of the test methods have been according to these new categories;
d) revision of the tables, figures and references according to changes.

Life cycle

PREVIOUSLY

PUBLISHED
IEC 62391-2:2006 ED1

NOW

IN_DEVELOPMENT
IEC 62391-2 ED2
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Nov 22, 2024

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login