DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 62933-3-1 ED1

Electrical energy storage (EES) systems - Part 3-1: Planning and performance assessment of electrical energy storage systems - General specification

General information

50.20     Jun 20, 2025

PRVD    Aug 1, 2025

IEC

TC 120

International Standard

13.020.30  

Scope

IEC 62933-3-1:2025 is applicable to EES systems designed for grid-connected indoor or outdoor installation and operation. This document considers:
necessary functions and capabilities of EES systems; sizing and design of EES system; operation of EES system; test items and performance assessment methods for EES systems; requirements for monitoring and acquisition of EES system operating parameters; exchange of system information and control capabilities required; maintenance of EES system. Stakeholders of this document comprise personnel involved with EES systems, which include:
- planners of electric power systems and EES systems;
- owners of EES systems;
- operators of electric power systems and EES systems;
- constructors;
- suppliers of EES systems and its equipment;
- aggregators.
Use-case-specific technical documentation, including planning and installation specific tasks such as system design, monitoring, measurement, tests, operation and maintenance, are very important and can be found throughout this document.
NOTE This document has been written for AC grids, however parts can also apply to DC grids.

Life cycle

PREVIOUSLY

PUBLISHED
IEC TS 62933-3-1:2018 ED1

NOW

IN_DEVELOPMENT
IEC 62933-3-1 ED1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Jun 20, 2025

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login