DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 60086-2-1 ED1

Primary batteries - Part 2-1: Physical and electrical specifications of batteries with aqueous electrolyte

General information

50.20     Dec 19, 2025

PRVD    Jan 30, 2026

IEC

TC 35

International Standard

29.220.10  

Scope

This first edition cancels and replaces the fourteenth edition of IEC 60086 2 published in 2021. This edition constitutes a technical revision.

This edition includes the following significant technical changes with respect to the previous edition:

a) separation of lithium batteries into IEC 60086-2-2: Physical and electrical specifications;

b) in Clause 3, terms were reordered according their functions: electrochemical systems, electrochemical systems, electrical characteristics and specifications;

c) TR03 and TR6 were added in Category 1, Round batteries;

d) load of digital audio test for LR03, TR03 and R03 was changed from 50 mA to 75 mA and MAD was modified;

e) personal grooming test of LR6 was added instead of high drain application test;

f) high drain application test was added for TR6;

g) radio /clock /remote control test was added for R6S;

h) CD, digital audio, wireless gaming and accessories test was removed for LR6, R6P and R6S;

i) 4,5 V of common designation was added for 3LR12, 3R12P and 3R12S;

j) Annex D for common designation of IEC 60086 2:2021 was moved to IEC 60086 1:2026, as Annex H;

k) Annex E for Compliance checklist of IEC 60086 2:2021 was removed and merged into Annex J of IEC 60086 1:2026.

This part of IEC 60086 is applicable to primary batteries which are based on standardised electrochemical systems using aqueous electrolytes.

It specifies

– the physical dimensions,

– the discharge test conditions and discharge performance requirements.

Life cycle

PREVIOUSLY

PUBLISHED
IEC 60086-2:2021 ED14

NOW

IN_DEVELOPMENT
IEC 60086-2-1 ED1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Dec 19, 2025

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login