DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC 61300-2-33 ED4

Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-33: Tests - Assembly and disassembly of fibre optic mechanical splices, fibre management systems, protective housings and hardened connectors

General information

50.20     Dec 12, 2025

PRVD    Jan 23, 2026

IEC

TC 86/SC 86B

International Standard

33.180.20  

Scope

IEC 61300-2-33: 2026 evaluates the behaviour of a fibre optic mechanical splice, a fibre management system, a protective housing or a hardened connector after being subjected to a specified number of assembly and disassembly operations. The test procedures described in this document simulate conditions that the component can encounter during its service lifetime to check the following performance characteristics:
- capability of an optical mechanical splice to be reinstalled after being disassembled;
- capability to reintroduce fibre management systems and protective housings, accessing fibres and optical components and making reconfigurations without disturbing transmission in adjacent fibre circuits;
- sealing performance of the protective housing after frequent opening and closing operations;
- sealing performance of the hardened connector after frequent mating and demating operations.
This fourth edition cancels and replaces the third edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
a) update of the terms and definitions according to IEC 61753-1:2018 and IEC 61756‑1:2019;
b) update of the test severities according to the new edition of IEC 61753-1:2018;
c) addition of procedure D to verify the sealing performance after frequent mating and demating of a hardened connector.

Life cycle

PREVIOUSLY

PUBLISHED
IEC 61300-2-33:2012 ED3

NOW

IN_DEVELOPMENT
IEC 61300-2-33 ED4
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Dec 12, 2025

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login