DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC TR 62222:2005 ED1

Fire performance of communication cables installed in buildings

Mar 7, 2005

General information

99.60     Jul 4, 2012

IEC

TC 46/SC 46C

Technical Report

33.120.20  

English   French  

Buying

Revised

Language in which you want to receive the document.

Scope

provides recommendations for the requirements and test methods to be specified for the fire performance of communication cables when installed in building,.related to typical applications and installation practices for copper and optical cables in buildings. It includes an assessment of the fire hazards presented by such installations, and describes fire scenarios that have been established and the appropriate cable fire performances to mitigate these hazards. It also takes into account legislation and regulation applicable to the fire performance of cables, the results of known research work and an assessment of known test methods and their ability to measure the recommended fire performance.

Life cycle

NOW

WITHDRAWN
IEC TR 62222:2005 ED1
99.60 Withdrawal effective
Jul 4, 2012

REVISED BY

WITHDRAWN
IEC TR 62222:2012 ED2