DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

IEC TS 63217:2021 ED1

Utility-interconnected photovoltaic inverters - Test procedure for over voltage ride-through measurements

Nov 22, 2021

General information

60.60     Nov 22, 2021

IEC

TC 82

Technical Specification

27.160  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC TS 63217:2021 provides a test procedure for evaluating the performance of Over Voltage Ride-Through (OVRT) functions in inverters used in utility-interconnected photovoltaic (PV) systems.
This document is most applicable to large systems where PV inverters are connected to utility high voltage (HV) distribution systems. However, the applicable procedures may also be used for low voltage (LV) installations in locations where evolving OVRT requirements include such installations, e.g. single-phase or 3-phase systems. This document is for testing of PV inverters, though it contains information that may also be useful for testing of a complete PV power plant consisting of multiple inverters connected at a single point to the utility grid. It further provides a basis for utility-interconnected PV inverters numerical simulation and model validation.

Life cycle

NOW

PUBLISHED
IEC TS 63217:2021 ED1
60.60 Standard published
Nov 22, 2021

National adoptions

Utility-interconnected photovoltaic inverters - Test procedure for over voltage ride-through measurements

60.60 Standard published

DPS/KT 6 more

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login