prDS CLC/TS 50729:2025

Railway applications - Fixed installations and rolling stock - Interface requirements between charging infrastructure with dedicated contact line sections and electric traction units with onboard electric traction energy storages and current collectors

General information

40.20     Feb 9, 2026

40.60    May 11, 2026

DPS

DPS/KT 7

Technical Specification

29.280     35.240.50  

Scope

This document specifies interface requirements between charging infrastructure with dedicated contact line sections and electric traction units with onboard electric traction energy storages and current collectors.
The dedicated contact line section can be
- separated from other contact line systems of electrified railway lines and fed separately, or
- connected electrically and/or mechanically with contact line systems of electrified railway lines.
The charging infrastructure can be used for charging the traction units with onboard electric traction energy storages at a standstill and/or when moving.
This document covers the following aspects:
- supply voltages and frequencies,
- compatibility (e.g. avoidance of (unacceptable) unbalances) with the feeding grid (national 3 AC grid),
- interaction between the vehicle traction/charging system and the electric traction charging power supply system,
- transmitting required information towards driver and/or electric traction unit,
- contact line system,
- maximum load current,
- contact line protection principles,
- electrical safety,
- stray current protection (in case of DC electric traction power supply systems),
- protection against influence on signalling systems, and
- energy measurement and settlement.
This document applies to new charging infrastructure and/or new electric traction units with onboard electric traction energy storage.
Although this document is primarily applicable to railways it can also be partially applied to guided mass transport systems such as:
1) tramways, and
2) elevated and underground railways.
This document does not apply to charging with a plug or connector solution or inverted current collectors mounted on the infrastructure side.
This document does not apply to electric road systems with overhead contact line systems.

Life cycle

NOW

IN_DEVELOPMENT
prDS CLC/TS 50729:2025
40.20 DIS ballot initiated: 12 weeks
Feb 9, 2026

Related project

Adopted from CLC/TS 50729:2025 IDENTICAL

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to create an account. If you are a member, please log in to your account by clicking on the "Log in" button.

Login