DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

prDS CLC IEC/TS 63291-1:2025

High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 1: Guideline

General information

10.00     Jan 7, 2026

DPS

DPS/KT 3

Technical Specification

29.200     29.240.01  

Scope

From this edition, the CLC TS 50654-1 is the adoption (identical) of the IEC TS 63291-1 (not covered by a parallel procedure).

This document contains guidelines on planning, specification, and execution of multi-vendor HVDC grid systems also referred to as HVDC grids. The terms "HVDC grid systems" or "HVDC grids" are used in this document to describe HVDC systems for power transmission having more than two HVDC stations connected to a common DC circuit. The DC circuit can be of radial or meshed topology or a combination thereof. In this document, the term "HVDC grids" is used.
While this document focuses on requirements specific for HVDC grids, some requirements are considered applicable to all HVDC systems in general, i.e., including point-to-point HVDC systems. Existing IEC (e.g. IEC TR 63363-1 [1]), Cigre or other relevant documents have been used for reference as far as possible.
Corresponding to electric power transmission applications, this document is applicable to high voltage systems, i.e. those having typically nominal DC voltages higher than 50 kV with respect to earth are considered in this document. NOTE While the physical principles of DC networks are basically voltage independent, the technical options for designing equipment get much wider with lower DC voltage levels, e.g. in the case of converters or switchgear.
This document covers technical aspects of:
• coordination of HVDC grid and AC systems,
• HVDC grid characteristics,
• HVDC grid control,
• HVDC grid protection,
• AC/DC converter stations,
• HVDC grid installations, including DC switching stations and HVDC transmission lines,
• studies and associated models,
• testing.
Beyond the scope of this document, the following content is proposed for future work:
• DC/DC converter stations.

Life cycle

PREVIOUSLY

PUBLISHED
DS CLC/TS 50654-1:2020

NOW

IN_DEVELOPMENT
prDS CLC IEC/TS 63291-1:2025
10.00 Proposal for new project registered
Jan 7, 2026

Related project

Adopted from CLC IEC/TS 63291-1:2025 IDENTICAL

Adopted from IEC TS 63291-1:2023 ED1 IDENTICAL