DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS IEC TS 62786:2017 ED1

Distributed energy resources connection with the grid

Jun 8, 2023

General information

60.60     Jun 8, 2023

95.99   

DPS

DPS/KT 3

Technical Specification

29.240.01  

English  

Buying

Published

Language in which you want to receive the document.

Scope

IEC TS 62786:2017(E) provides principles and technical requirements for distributed energy resources (DERs) connected to the distribution network. It applies to the planning, design, operation and connection of DERs to distribution networks. It includes general requirements, connection scheme, choice of switchgear, normal operating range, immunity to disturbances, active power response to frequency deviation, reactive power response to voltage variations and voltage changes, EMC and power quality, interface protection, connection and start to generate electrical power, active power management, monitoring, control and communication, and conformance tests.
This document specifies interface requirements for connection of generating plants with the distribution network operating at a nominal frequency of 50 Hz or 60 Hz.
DERs include distributed generation and permanently connected electrical energy storage in the form of synchronous generators, asynchronous generators, converters, etc., connected to the medium voltage (MV) or low voltage (LV) distribution network.

Life cycle

NOW

PUBLISHED
DS IEC TS 62786:2017 ED1
60.60 Standard published
Jun 8, 2023

Related project

Adopted from IEC TS 62786:2017 ED1

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login