DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH HD 60364-7-712:2016

Low-voltage electrical installations - Part 7-712: Requirements for special installations or locations - Photovoltaic (PV) systems

Oct 20, 2016

General information

60.60     Oct 20, 2016

DPS

DPS/KT 6

Harmonization Document

27.160     91.140.50  

English  

Buying

Published

Language in which you want to receive the document.

Scope

This section applies to the electrical installation of PV generator intended to supply all or part of an installation and feeding of electricity into the public grid or local distribution.
In this section, the electrical equipment of a PV generator, like any other item of electrical equipment, is dealt with only so far as its selection and application in the installation is concerned.
The electrical installation of a PV generator starts from a PV module or a set of PV modules connected in series with their cables, provided by the PV module manufacturer, up to the user installation or the utility supply point.
Requirements of this document apply to
– PV generators for supply to an installation which is not connected to a system for distribution of electricity to the public,
– PV generators for supply to an installation in parallel with a system for distribution of electricity to the public,
– PV generators for supply to an installation as an alternative to a system for distribution of electricity to the public,
– appropriate combination of the above.
Requirements for PV generators with batteries or other energy storage methods are under consideration.

Life cycle

PREVIOUSLY

WITHDRAWN
SSH HD 60364-7-712:2005

NOW

PUBLISHED
SSH HD 60364-7-712:2016
60.60 Standard published
Oct 20, 2016

Related project

Adopted from HD 60364-7-712:2016