DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

DS ISO/TS 18683:2015

Guidelines for systems and installations for supply of LNG as fuel to ships

Oct 30, 2015

General information

60.60     Oct 30, 2015

DPS

DPS/KT 269

Technical Specification

75.200  

English  

Buying

Published

Language in which you want to receive the document.

Scope

ISO/TS 18683:2015 gives guidance on the minimum requirements for the design and operation of the LNG bunkering facility, including the interface between the LNG supply facilities and receiving ship as shown in Figure 1.
ISO/TS 18683:2015 provides requirements and recommendations for operator and crew competency training, for the roles and responsibilities of the ship crew and bunkering personnel during LNG bunkering operations, and the functional requirements for equipment necessary to ensure safe LNG bunkering operations of LNG fuelled ships.
ISO/TS 18683:2015 is applicable to bunkering of both seagoing and inland trading vessels. It covers LNG bunkering from shore or ship LNG supply facilities, as shown in Figure 1 and described in Clause 4, and addresses all operations required such as inerting, gassing up, cooling down, and loading.

Life cycle

NOW

PUBLISHED
DS ISO/TS 18683:2015
60.60 Standard published
Oct 30, 2015

Related project

Adopted from ISO/TS 18683:2015

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login