DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 50518-1:2010

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Oct 21, 2010
95.99 Withdrawal of Standard   Dec 20, 2016

General information

95.99     Dec 20, 2016

DPS

DPS/KT 6

European Norm

13.320  

English  

Buying

Withdrawn

Language in which you want to receive the document.

Scope

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Life cycle

NOW

WITHDRAWN
SSH EN 50518-1:2010
95.99 Withdrawal of Standard
Dec 20, 2016

REVISED BY

WITHDRAWN
SSH EN 50518-1:2013

Related project

Adopted from EN 50518-1:2010