DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

SSH EN 14475:2006

Execution of special geotechnical works - Reinforced fill

Jan 25, 2008

General information

60.60     Jan 25, 2008

DPS

DPS/KT 288

European Norm

93.020  

English  

Buying

Published

Language in which you want to receive the document.

Scope

1.1 This European Standard establishes general principles for the construction of reinforced fill.
1.2 This European Standard covers engineered fills that are reinforced by the inclusion of horizontal or sub-horizontal reinforcement placed between layers of fill during construction.
1.3 The scope of reinforced fill applications considered in this European Standard includes (Figure 1):
¾ earth retaining structures, (vertical, battered or inclined walls, bridge abutments, bulk storage facilities), with a facing to retain fill placed between the reinforcing layers;
¾ reinforced steep slopes with a facing, either built-in or added or wrap-around, reinforced shallow slopes without a facing, but covered by some form of erosion protection without a facing, reinstatement of failed slopes;
¾ embankments with basal reinforcement and embankments with reinforcement against frost heave in the upper part.
Principles for the execution of other special geotechnical works using soil nails, bored piles, displacement piles, micro piles, sheet pile walls, diaphragm walls, grouting or jet grouting are established in other European Standards.
Reinforcement of road pavements is not covered by this Standard.

Life cycle

NOW

PUBLISHED
SSH EN 14475:2006
60.60 Standard published
Jan 25, 2008

Related project

Adopted from EN 14475:2006

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login