DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Laser displays - Part 5-8: Measurement of scanning characteristics for raster-scanning laser display

40.60 Close of voting

TC 110 more

Touch and interactive displays - Part 1-3: Generic - Overview of pen touch technology

60.00 Standard under publication

TC 110 more

Bi-directional grid connected power converters - Part 3: EMC requirements and test methods

30.99 CD approved for registration as DIS

TC 22/SC 22E more

Amendment 1 - Photovoltaic (PV) modules - Type approval, design and safety qualification - Retesting

20.99 WD approved for registration as CD

TC 82 more

Photovoltaic power generating systems - EMC requirements and test methods for power conversion equipment

50.00 Final text received or FDIS registered for formal approval

TC 82 more

Flow batteries for stationary applications - Part 1: Terminology

20.99 WD approved for registration as CD

TC 21 more

Flow batteries for stationary applications – Part 2: Performance

20.99 WD approved for registration as CD

TC 21 more

Flow batteries for stationary applications – Part 3: Safety

20.99 WD approved for registration as CD

TC 21 more

Flow batteries for stationary applications - Part 4-1: Electrolyte for vanadium flow batteries – Specification and Safety

30.60 Close of voting/ comment period

TC 21 more

Flow batteries for stationary applications – Part 4-2: Electrolyte for vanadium flow batteries – Test methods

20.99 WD approved for registration as CD

TC 21 more

Flow batteries for stationary applications - Part 5: Vanadium flow battery stack

20.99 WD approved for registration as CD

TC 21 more

Electric energy storage (ESS) systems – Part 2-4 Guidelines for the Integration of Diverse Accumulation Subsystems in EESS

20.99 WD approved for registration as CD

TC 120 more

Electrical energy storage (EES) systems - Part 3-2: Planning and performance assessment of electrical energy storage systems - Specific requirements for power intensive and renewable energy sources integration related applications

20.99 WD approved for registration as CD

TC 120 more

Electrical energy storage (EES) systems - Part 3-3: Planning and performance assessment of electrical energy storage systems - Specific requirements for energy intensive and backup power applications

20.99 WD approved for registration as CD

TC 120 more

Terrestrial photovoltaic (PV) modules - Quality system for PV module manufacturing

40.99 Full report circulated: DIS approved for registration as FDIS

TC 82 more

Amendment 1 - Electrically operated spray seat for household and similar use - Methods for measuring the performance - General test methods of spray seats

30.60 Close of voting/ comment period

TC 59/SC 59L more

Residual direct current detecting device (RDC-DD) to be used for mode 3 charging of electric vehicles

40.99 Full report circulated: DIS approved for registration as FDIS

TC 23/SC 23E more

Optical fibre cables - Shrinkage effects on cable and cable element end termination - Guidance

30.60 Close of voting/ comment period

TC 86/SC 86A more