Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Small craft — Guidelines for auto watertight ventilation shutdown system
20.60 Close of comment period
Adhesives — Installation of floor coverings, wood flooring, levelling compounds and tiles — Specification of trowel notch sizes
20.20 Working draft (WD) study initiated
Laminated products made of bamboo strips for indoor furniture purposes
20.20 Working draft (WD) study initiated
Assistive products — Guidelines for user needs survey of assistive products for persons with impaired sensory functions
20.20 Working draft (WD) study initiated
Traditional Chinese Medicine — General requirements for the ultrafine powder of herbs
20.20 Working draft (WD) study initiated
Eggs and egg products — Determination of fipronil and metabolites residues — Liquid chromatography-tandem mass spectrometry
20.20 Working draft (WD) study initiated
Meat and meat products — Determination of nitrite and nitrate content-ion chromatography method
20.20 Working draft (WD) study initiated
Specification for wetting agents for application on Class A fires
20.20 Working draft (WD) study initiated
Titanium and titanium alloys-Plate, sheet and strip-Technical delivery conditions
20.20 Working draft (WD) study initiated
Titanium and titanium alloys — Bar, rod and billet-Technical delivery conditions
20.20 Working draft (WD) study initiated
Microbiology of the food chain — General requirements and guidance for microbiological examinations
20.20 Working draft (WD) study initiated
Fire detection and alarm systems — Part 29: Video fire detectors
20.20 Working draft (WD) study initiated
Fire detection and fire alarm systems — Part 32: Non-resettable line-type heat detectors
20.20 Working draft (WD) study initiated
Fire detection and alarm systems — Part 7: Point-type smoke detectors using scattered light, transmitted light or ionization
20.99 WD approved for registration as CD
Medical gas pipeline systems — Part 3: Proportioning units for the production of synthetic medical air
20.20 Working draft (WD) study initiated
Medical gas pipeline systems — Part 4: Air Compressor Units
20.20 Working draft (WD) study initiated
Medical gas pipeline systems — Part 5: Oxygen Concentrator UNits
20.20 Working draft (WD) study initiated