Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Industrial systems, installations and equipment and industrial products — Structuring principles and reference designations — Part 101: Modelling concepts, guidelines and requirements for power supply systems
30.00 Committee draft (CD) registered
Industrial systems, installations and equipment and industrial products — Structuring principles and reference designations — Part 102: Guidelines and requirements for power transmission and distribution systems
10.60 Close of voting
Industrial systems, installations and equipment and industrial products — Structuring principles and reference designations — Part 12: Construction works and building services
00.00 Proposal for new project received
Industrial systems, installations and equipment and industrial products — Structuring principles and reference designations — Part 16: Infrastructure systems
00.00 Proposal for new project received
Industrial systems, installations and equipment and industrial products — Classification and designation of information — Part 2: Examples of information
00.00 Proposal for new project received
Pneumatic fluid power — Cylinders, 1 000 kPa (10 bar) series — Mounting dimensions of rod-end spherical eyes
40.20 DIS ballot initiated: 12 weeks
Thermal insulation — Bonded preformed man-made mineral fibre pipe sections — Specification
30.60 Close of voting/ comment period
Dentistry — Polymeric materials for dental implant surgical guide
30.00 Committee draft (CD) registered
Ethylene and propylene for industrial use — Determination of trace oxygenates — Gas chromatographic method
40.20 DIS ballot initiated: 12 weeks
Reciprocating internal combustion engines — Exhaust emission measurement — Part 1: Test-bed measurement systems of gaseous and particulate emissions
40.20 DIS ballot initiated: 12 weeks
Reciprocating internal combustion engines — Exhaust emission measurement — Part 4: Test cycles and emission calculations for different engine applications
40.20 DIS ballot initiated: 12 weeks
Reciprocating internal combustion engines — Exhaust emission measurement — Part 5: Test fuels
40.20 DIS ballot initiated: 12 weeks
Welding and allied processes — Guidelines for the use of the welding parameters related to the welding energy for qualification and specification of welding procedures
50.00 Final text received or FDIS registered for formal approval
Gas welding equipment — Specification for hose assemblies for equipment for welding, cutting and allied processes
40.99 Full report circulated: DIS approved for registration as FDIS
Surface active agents — Washing powders — Determination of total silica content — Gravimetric method
30.00 Committee draft (CD) registered
Sequencing and clinical application to infectious diseases
30.60 Close of voting/ comment period
Traveller irrigation machines — Part 1: Operational characteristics and laboratory and field test methods
30.20 CD study/ballot initiated