Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Aluminium and aluminium alloys — Foil — Part 2: Mechanical properties
30.60 Close of voting/ comment period
Aluminium and aluminium alloys — Foil — Part 3: Dimensional tolerances
30.60 Close of voting/ comment period
Mathematics for datums and datum systems — Part 1: Title missing
00.00 Proposal for new project received
Petroleum measurement systems — Part 2: Pipe prover design, calibration and operation — Amendment 1
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Cranes — Graphical symbols — — Part 1: General
20.00 New project registered in TC/SC work programme
Milled cereal products — Determination of fat acidity
00.00 Proposal for new project received
Aircraft — High temperature convoluted hose assemblies in polytetrafluoroethylene (PTFE)
30.99 CD approved for registration as DIS
Aerospace — Fluid systems — Metal hose assemblies
30.99 CD approved for registration as DIS
Iron ores — Determination of combined water content — Karl Fischer titrimetric method
30.99 CD approved for registration as DIS
Juniper berries (Juniperus communis Linnaeus) — Specification
30.20 CD study/ballot initiated
Fine bubble technology — Evaluation method for determining gas content in fine bubble dispersions in water — Part 3: Ozone content
50.00 Final text received or FDIS registered for formal approval
Building and civil engineering sealants — Determination of elastic recovery of sealants
40.00 DIS registered
Building and civil engineering sealants — Determination of resistance to flow of sealants
40.00 DIS registered
Medical gas pipeline systems — Part 1: Pipeline systems for compressed medical gases and vacuum
50.00 Final text received or FDIS registered for formal approval
Coals — Part 6: Test method for determination of oxidation of coal
00.60 Close of review
Dentistry — Evaluation of biocompatibility of medical devices used in dentistry
00.00 Proposal for new project received
Road vehicles — Fuel injection equipment testing — Part 2: Orifice plate flow-measurement
30.00 Committee draft (CD) registered