Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Determination of the silanol group content on the surface of fumed silica — Part 2: Thermogravimetric analysis method
20.60 Close of comment period
Ships and marine technology — Test method for marine magnetic compass safe distance
00.00 Proposal for new project received
Soil quality — Determination of selected organotin compounds — Gas-chromatographic method
20.00 New project registered in TC/SC work programme
Sustainable mobility and transportation — Smart operation and maintenance — Part 1: Service role architecture
50.00 Final text received or FDIS registered for formal approval
Sustainable mobility and transportation — Smart operation and maintenance — Part 2: Principles and requirements based on management process
00.00 Proposal for new project received
Sustainable mobility and transportation — Smart operation and maintenance — Part 3: Evaluation and improvement based on maturity model
00.00 Proposal for new project received
Traditional Chinese medicine — Determination of selected Aconitum alkaloids by high-performance liquid chromatography (HPLC)
40.00 DIS registered
Traditional Chinese medicine — Lycium barbarum and Lycium chinense fruit
40.00 DIS registered
Enterprise modelling and architecture — Constructs for Service Modelling
00.60 Close of review
Uncoupling membranes/matting for ceramic tile installation
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Numerical control systems for machine tools — Part 3: Safety guidelines for NC system
20.00 New project registered in TC/SC work programme
Industrial automation systems and integration — Numerical control systems for machine tools — Part 4: Intelligent function requirements of NC system
10.20 New project ballot initiated
Industrial automation systems and integration — Numerical control systems for machine tools — Part 4: Intelligent function requirements of NC system
00.00 Proposal for new project received
Natural gas — Format for data from gas chromatograph analysers for natural gas — XML file format
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Drilling and foundation machinery — Horizontal directional drilling (HDD) machines — Safety requirements and verification
50.00 Final text received or FDIS registered for formal approval
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 2: Application layer and sequence requirements
00.00 Proposal for new project received
Road vehicles — Vehicle domain service (VDS) — Part 3: Network and transport layer requirements
00.00 Proposal for new project received