Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 1: General
20.00 New project registered in TC/SC work programme
Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 2: Pipes
20.00 New project registered in TC/SC work programme
Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 3: Fittings
20.00 New project registered in TC/SC work programme
Plastics piping systems for hot and cold water installations — Polyethylene of raised temperature resistance (PE-RT) — Part 5: Fitness for purpose of the system
20.00 New project registered in TC/SC work programme
Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management — Part 2: Definitions and descriptions
40.99 Full report circulated: DIS approved for registration as FDIS
Guidance for use in the application of ISO/IEC Guide 71:2014 — Part 2: Ergonomic design considerations
30.60 Close of voting/ comment period
Foil bearings — Performance testing of foil thrust bearings — Testing of static load capacity, bearing torque, friction coefficient and lifetime
40.60 Close of voting
Medical devices utilizing animal tissues and their derivatives — Part 3: Validation of the elimination and/or inactivation of viruses and transmissible spongiform encephalopathy (TSE) agents
10.99 New project approved
Use of reclaimed water in industrial cooling systems — Part 3: Guidelines for test simulation
20.00 New project registered in TC/SC work programme
Geotechnical investigation and testing — Field testing — Part 1: Electrical cone and piezocone penetration test — Amendment 1
40.60 Close of voting
Corrosion of metals and alloys — Sulfur dioxide test in a humid atmosphere (fixed gas method)
40.99 Full report circulated: DIS approved for registration as FDIS
Plastics and rubber machines — Extruders and ancillary equipment - Safety requirements
30.60 Close of voting/ comment period
Design process of ventilative cooling systems — Part 1: Non-residential buildings
00.00 Proposal for new project received
Statistical methods in process management — Capability and performance — Part 1: General principles and concepts
10.99 New project approved
Statistical methods in process management — Capability and performance — Part 5: Process capability estimates and performance for attributive characteristics
30.20 CD study/ballot initiated
Statistical methods in process management — Capability and performance — Part 7: Capability of measurement processes
60.00 Standard under publication
External limb prostheses and external orthoses — Requirements and test methods
40.60 Close of voting
Plastics — Carbon and environmental footprint of biobased plastics — Part 5: Reporting and declarations
10.20 New project ballot initiated