Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Structures for mine shafts — Part 1: Vocabulary
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 2: Headframe structures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 3: Sinking stages
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 4: Conveyances
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 5: Shaft system structures
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Structures for mine shafts — Part 6: Design of shaft lining
20.60 Close of comment period
Building construction machinery and equipment — Portable, hand-held, internal combustion engine-driven abrasive cutting machines — Part 2: Safety requirements for machines for abrasive chains
50.00 Final text received or FDIS registered for formal approval
Quality management systems — Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety (ITNS)
30.60 Close of voting/ comment period
Road vehicles — Environmental conditions and testing for electrical and electronic equipment for drive system of electric propulsion vehicles — Part 6: Traction battery packs and systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Determination of rare earth impurity contents in individual rare earth metals and their oxides — Inductively coupled plasma mass spectrometry Part 1: Determination of rare earth impurity contents in individual La, Ce, Pr, Nd, Sm metals and their oxides
20.99 WD approved for registration as CD
Intelligent transport systems — Data interfaces between centres for transport information and control systems — Platform-independent model specifications for data exchange protocols for transport information and control systems
10.99 New project approved
Monitoring and mitigation of fire laboratory emissions
20.00 New project registered in TC/SC work programme
Machinery for forestry — Winches — Part 1: Dimensions, performance and safety
40.60 Close of voting
Polyethylene pipes and fittings for the supply of gaseous fuels or water — Training and assessment of fusion operators
30.60 Close of voting/ comment period
Intelligent transport systems — Highly Automated Motorway Chauffeur Systems (HMCS)
50.00 Final text received or FDIS registered for formal approval
Intelligent transport systems – Acceleration control for pedal error (ACPE) — Performance requirements and test procedures
00.00 Proposal for new project received
Intelligent transport systems ― Acceleration control for pedal error(ACPE) ― Performance requirements and test procedures
20.00 New project registered in TC/SC work programme