Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 1: General
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 2: Pipes
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 3: Fittings
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for the supply of gaseous fuels - Polyethylene (PE) - Part 4: Valves
40.20 DIS ballot initiated: 12 weeks
Welding - Grouping system for metallic materials (ISO 15608:2025)
40.20 DIS ballot initiated: 12 weeks
Railway applications - Acoustics - Rail and wheel roughness measurement related to noise generation
40.20 DIS ballot initiated: 12 weeks
Specification and qualification of welding procedures for metallic materials - Qualification based on a pre-production welding test (ISO 15613:2025)
40.20 DIS ballot initiated: 12 weeks
Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 11: Electron and laser beam welding (ISO 15614-11:2025)
40.20 DIS ballot initiated: 12 weeks
Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 2: Arc welding of aluminium and its alloys (ISO 15614-2:2025)
40.20 DIS ballot initiated: 12 weeks
Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 9: Underwater hyperbaric wet welding (ISO 15614-9:2025)
40.20 DIS ballot initiated: 12 weeks
Steel static storage systems - Tolerances, deformations and clearances
40.20 DIS ballot initiated: 12 weeks
Railway applications - Braking - Automatic variable load sensing devices
40.20 DIS ballot initiated: 12 weeks
Bitumens and bituminous binders - Determination of adhesivity of cut-back and fluxed bituminous binders by water immersion test - Aggregate method
40.20 DIS ballot initiated: 12 weeks
Maintenance - Qualification of maintenance personnel
40.20 DIS ballot initiated: 12 weeks
Steel for the reinforcement and prestressing of concrete - Test methods - Part 3: Prestressing steel (ISO 15630-3:2025)
40.20 DIS ballot initiated: 12 weeks
District heating pipes - Bonded twin pipe systems for directly buried hot water networks - Part 1: Factory made twin pipe assembly of steel service pipes, polyurethane thermal insulation and one casing of polyethylene
40.20 DIS ballot initiated: 12 weeks
District heating pipes - Bonded twin pipe systems for directly buried hot water networks - Part 2: Factory made fitting and valve assemblies of steel service pipes, polyurethane thermal insulation and one casing of polyethylene
40.20 DIS ballot initiated: 12 weeks
Non-destructive testing - Radiation methods for computed tomography - Part 3: Operation and interpretation (ISO 15708-3:2025)
40.20 DIS ballot initiated: 12 weeks