Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Explosives for civil uses - Detonators and detonating cord relays - Part 17: Verification of the no-fire current of electric detonators
10.99 New project approved
Explosives for civil uses - Detonators and detonating cord relays - Part 19: Verification of all-fire impulse and no-fire impulse of electric detonators
10.99 New project approved
Explosives for civil uses - Detonators and detonating cord relays - Part 3: Verification of insensitiveness to impact of detonators, surface connectors, detonating cord relays and shock tubes
10.99 New project approved
Surgical clothing and drapes - Requirements and test methods - Part 1: Surgical drapes and gowns
40.20 DIS ballot initiated: 12 weeks
Surgical clothing and drapes - Requirements and test methods - Part 2: Clean air suits
40.20 DIS ballot initiated: 12 weeks
Foodstuffs - Determination of trace elements - Part 1: Determination of total mercury in foodstuffs by atomic absorption spectrometry (AAS) - cold vapour technique after pressure digestion
40.20 DIS ballot initiated: 12 weeks
Foodstuffs - Determination of trace elements - Part 2: Determination of total mercury in foodstuffs by atomic fluorescence spectrometry (AFS) - cold vapour technique after pressure digestion
40.20 DIS ballot initiated: 12 weeks
Foodstuffs - Determination of trace elements - Part 3: Determination of total mercury in foodstuffs with atomic absorption directly from the foodstuff (elemental mercury analysis)
40.20 DIS ballot initiated: 12 weeks
Building valves - Manually operated copper alloy and stainless steel ball valves for potable water supply in buildings - Tests and requirements
40.20 DIS ballot initiated: 12 weeks
Railway applications - Track - Track geometry quality - Part 4: Measuring systems - Manual and lightweight devices
40.20 DIS ballot initiated: 12 weeks
Method of test for screed materials - Part 10: Determination of moisture content - Calcium Carbide Method
40.20 DIS ballot initiated: 12 weeks
Methods of test for screed materials - Part 9: Dimensional stability
40.20 DIS ballot initiated: 12 weeks
Welding - Measurement of preheating temperature, interpass temperature and preheat maintenance temperature (ISO 13916:2025)
40.20 DIS ballot initiated: 12 weeks
Explosives for civil uses - Propellants and rocket propellants - Part 4: Determination of the burning rate of solid gun propellants and black powder
10.99 New project approved
Water quality - Guidance standard for the routine sampling and preparation of benthic diatoms from rivers and lakes
40.20 DIS ballot initiated: 12 weeks
Refrigeration systems and heat pumps - Flexible pipe elements, vibration isolators, expansion joints and non-metallic tubes - Requirements and classification (ISO 13971:2012)
40.20 DIS ballot initiated: 12 weeks
Plastics piping systems for non-pressure underground drainage and sewerage - Unplasticized poly(vinyl chloride) (PVC-U) - Part 2: Guidance for the assessment of conformity
40.20 DIS ballot initiated: 12 weeks
Laboratory furniture - Recommendations for design and installation - Part 1: General
40.20 DIS ballot initiated: 12 weeks