DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

Projects

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Gas infrastructure - Gas pressure control stations for transmission and distribution - Functional requirements

40.20 DIS ballot initiated: 12 weeks

DPS/KT 269 more

Small craft - Hull construction and scantlings - Part 10: Rig loads and rig attachment in sailing craft (ISO 12215-10:2020)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 320 more

Small craft - Hull construction and scantlings - Part 7: Determination of loads for multihulls and of their local scantlings using ISO 12215-5 (ISO 12215-7:2020)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 320 more

Small craft - Stability and buoyancy assessment and categorization - Part 1: Non-sailing boats of hull length greater than or equal to 6 m (ISO 12217-1:2022)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 320 more

Small craft - Stability and buoyancy assessment and categorization - Part 2: Sailing boats of hull length greater than or equal to 6 m (ISO 12217-2:2022)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 320 more

Small craft - Stability and buoyancy assessment and categorization - Part 3: Boats of hull length less than 6 m (ISO 12217-3:2022)

40.20 DIS ballot initiated: 12 weeks

DPS/KT 320 more

LPG equipment and accessories - Equipping of LPG road tankers

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Fixed firefighting systems - Components for sprinkler and water spray systems - Part 15: Spray pattern sprinklers with a k-factor of at least K160, extended coverage sprinklers of at least K80 and control mode special application sprinklers

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more

Surface dressing - Test methods - Part 1: Rate of spread and accuracy of spread of binder and chippings

40.20 DIS ballot initiated: 12 weeks

DPS/KT 336 more

Surface dressing - Test methods - Part 3: Determination of binder aggregate adhesivity by the Vialit plate shock test method

40.20 DIS ballot initiated: 12 weeks

DPS/KT 336 more

Workshop fabricated steel tanks - Part 4: Vertical cylindrical single skin and double skin tanks for the aboveground storage of flammable and nonflammable water polluting liquids other than for heating and cooling of buildings

40.20 DIS ballot initiated: 12 weeks

DPS/KT 286 more

Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 6: Calculation of seasonal performances

40.20 DIS ballot initiated: 12 weeks

DPS/KT 269 more

Flexible sheets for waterproofing - Determination of resistance to tearing (nail shank) - Part 1: Bitumen sheets for roof waterproofing

40.20 DIS ballot initiated: 12 weeks

DPS/KT 254 more

Aircraft ground support equipment - Specific requirements - Part 15: Baggage and equipment tractors

40.20 DIS ballot initiated: 12 weeks

DPS/KT 320 more

Aircraft ground support equipment - Specific requirements - Part 5: Aircraft fuelling equipment

40.20 DIS ballot initiated: 12 weeks

DPS/KT 256 more

Wood-based panels - Characteristic values for structural design - Part 1: OSB, particleboards and fibreboards

40.20 DIS ballot initiated: 12 weeks

DPS/KT 175 more

Wood-based panels - Characteristic values for structural design - Part 2: Plywood

40.20 DIS ballot initiated: 12 weeks

DPS/KT 175 more

Steel wire ropes - Safety - Part 5: Stranded ropes for lifts

40.20 DIS ballot initiated: 12 weeks

DPS/KT 114 more