Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Gas infrastructure - Gas pressure control stations for transmission and distribution - Functional requirements
40.20 DIS ballot initiated: 12 weeks
Small craft - Hull construction and scantlings - Part 10: Rig loads and rig attachment in sailing craft (ISO 12215-10:2020)
40.20 DIS ballot initiated: 12 weeks
Small craft - Hull construction and scantlings - Part 7: Determination of loads for multihulls and of their local scantlings using ISO 12215-5 (ISO 12215-7:2020)
40.20 DIS ballot initiated: 12 weeks
Small craft - Stability and buoyancy assessment and categorization - Part 1: Non-sailing boats of hull length greater than or equal to 6 m (ISO 12217-1:2022)
40.20 DIS ballot initiated: 12 weeks
Small craft - Stability and buoyancy assessment and categorization - Part 2: Sailing boats of hull length greater than or equal to 6 m (ISO 12217-2:2022)
40.20 DIS ballot initiated: 12 weeks
Small craft - Stability and buoyancy assessment and categorization - Part 3: Boats of hull length less than 6 m (ISO 12217-3:2022)
40.20 DIS ballot initiated: 12 weeks
LPG equipment and accessories - Equipping of LPG road tankers
40.20 DIS ballot initiated: 12 weeks
Fixed firefighting systems - Components for sprinkler and water spray systems - Part 15: Spray pattern sprinklers with a k-factor of at least K160, extended coverage sprinklers of at least K80 and control mode special application sprinklers
40.20 DIS ballot initiated: 12 weeks
Surface dressing - Test methods - Part 1: Rate of spread and accuracy of spread of binder and chippings
40.20 DIS ballot initiated: 12 weeks
Surface dressing - Test methods - Part 3: Determination of binder aggregate adhesivity by the Vialit plate shock test method
40.20 DIS ballot initiated: 12 weeks
Workshop fabricated steel tanks - Part 4: Vertical cylindrical single skin and double skin tanks for the aboveground storage of flammable and nonflammable water polluting liquids other than for heating and cooling of buildings
40.20 DIS ballot initiated: 12 weeks
Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 6: Calculation of seasonal performances
40.20 DIS ballot initiated: 12 weeks
Flexible sheets for waterproofing - Determination of resistance to tearing (nail shank) - Part 1: Bitumen sheets for roof waterproofing
40.20 DIS ballot initiated: 12 weeks
Aircraft ground support equipment - Specific requirements - Part 15: Baggage and equipment tractors
40.20 DIS ballot initiated: 12 weeks
Aircraft ground support equipment - Specific requirements - Part 5: Aircraft fuelling equipment
40.20 DIS ballot initiated: 12 weeks
Wood-based panels - Characteristic values for structural design - Part 1: OSB, particleboards and fibreboards
40.20 DIS ballot initiated: 12 weeks
Wood-based panels - Characteristic values for structural design - Part 2: Plywood
40.20 DIS ballot initiated: 12 weeks
Steel wire ropes - Safety - Part 5: Stranded ropes for lifts
40.20 DIS ballot initiated: 12 weeks